Data center siting

Pick your cluster size and we'll help you find power.

8

Scroll to find power ↓

Retail vs wholesale power

Click a territory for its utility rate, or a pillar for its wholesale price. Drag the cluster to move it.

01 — Interconnection

Utility interconnection tiers

Service required by load size. Starts at 480 V secondary service and goes up to transmission.
Rules and timelines shown are PG&E's, which serves most candidate sites. Municipal and irrigation-district utilities (SMUD, Turlock, Modesto, Silicon Valley Power and others) apply their own service rules and timelines.

02 — Utility rates

Retail power cost

This is what you're likely to pay on a retail rate.
This is the all-in cost for your cluster.
We break it down by utility and rate schedule; these are typically split into energy, demand and fixed charges.
Wholesale prices are shown in the next section.

All-in retail cost, $/kWh

Click a bar for the full tariff.

03 — Wholesale prices

CAISO nodal prices

Day-ahead (DAM) and real-time (RTM) locational marginal prices from NRGStream. Use these prices to compare locations and to estimate energy costs with wholesale market participation.
If you'd like to look at wholesale pricing, these are the rates your project might be subject to, based on prices so far in 2026 (this doesn't include future power price forecasts, a service Barker Infra offers).

YTD LMP by node
Average price by hour of day
Monthly average

04 — Colocation

Colocation providers

Northern California colocation facilities. Sites that can take your racks, or advertise high-density or liquid-cooled space, are listed first.

Diamonds on the map · click one to place your cluster there
Facilities

Notes

Method, assumptions & sources